L o a d i n g
get quote Intro video

Countertop installation can take anywhere from one to three days, depending on the size of the project, the countertop material you’ve selected and how the countertops are being installed (poured in place, cut on site, prefabricated, etc.). When you get quotes from multiple contractors, ask them about their estimated timeline.

Quartz is extremely durable and maintains its beauty with minimal maintenance, excelling in high-traffic commercial areas.

Butcher block and granite require meticulous care and show wear quickly with constant use.

The ability to repair or refinish damaged countertops depends on the material and the extent of the damage. Granite and quartz can often be repaired, while marble may be more challenging.

item 81 to 84 of 93 total

get a free quote

Blank Form (#3)
Search
×